Vertical junctions installed

Ensuring a good connection between the slab and walls is critical for structural integrate. We have chosen to connect these two components together by 60x60cm L-Shaped 10mm reinforced steel bar (as seen in the foreground below). This has been laid at 25cm intervals all around the perimeter, which should result…

Continue reading

Bottom drains installed

We bought a number of individual parts from various places, including the local DIY store (Bricomarche), to make up a pressure testing rig that we can use to test the connections on various plumbing parts. In the simplest of terms it is a hosepipe connector attached to a central heating…

Continue reading

Second layer installed

The second layer of reinforced steel mesh has now been laid. It is at this point that we realise why the full size ST25C would have been useful. We have to place two sheets per width, which means that in some places we have four sheets overlapping, causing potential high…

Continue reading

Phase two planning

With the planning granted for the pool, I have now submitted planning for the conversion of the garage to a pool house. I did not submit this all in one go, as this is a slightly more stringent process and I did not want the lack of permission for this…

Continue reading

Formwork set

The formwork has now been setup, which was a little bit of a hassle as the boards are not as specified. They range from 175mm to 190mm in height, with none of them being 200mm as per specification. However, after some effort, they have been setout to give a level…

Continue reading

Construction begins…

It was a busy morning this morning, with the delivery of the necessary materials to do Phase One (concrete slab). The delivery included a 200 x 8mm steel reinforcing bars, 34 sheets of ST25CS steel reinforcing mesh (3m x 2.4m of 7mm rebar in 15×15 mesh), 150 L-Shaped 10mm rebar,…

Continue reading

Planning granted

I know that we took a little bit of a risk starting the dig before getting the building permit (déclaration préalable) but it has been over two months since we submitted the application and therefore tacit approval could be assumed. The bit that got me nervous, however, was an email…

Continue reading