Vertical junctions installed

Ensuring a good connection between the slab and walls is critical for structural integrate. We have chosen to connect these two components together by 60x60cm L-Shaped 10mm reinforced steel bar (as seen in the foreground below).

This has been laid at 25cm intervals all around the perimeter, which should result in one vertical rebar per cell of the shuttering blocks (blocs de coffrage).

Comments are closed.