So, I have now completed all of the jobs that I came out to do and it is now ready for the liner to be fitted and water… The key things for this trip were the pointing of the feature wall and the electrics being wired up. The technical room…
On the previous trip we had installed a temporary roof on the technical room to allow the electrician to connect up the fuse box with the mains. However, I have actually got back out before that has been done and have completed the final roof, as seen in the following…
Test installation of the firepit in top void of the wall is successful. It was a little windy and too light to get the full effect in the photo, but is going to be great at night! Next up was to finished the pointing of the stone tiles on the…