More progress on terrace…

Some more photos showing the progress being made by the team on the terracing. There are now five courses of blocks installed, so I now assume the ring beam will be the next to be installed, which will also be used to tie into the slabs.

Continue reading

Terrace Blockwork…

More photos as the blockwork progresses on training walls for the terracing area around the pool. The photo below shows the ‘planter’ at the far end of the run of blocks which will adjoin the steps from the top terrace down to the pool level. The following photo shows what…

Continue reading