So, I have now completed all of the jobs that I came out to do and it is now ready for the liner to be fitted and water… The key things for this trip were the pointing of the feature wall and the electrics being wired up. The technical room…
On the previous trip we had installed a temporary roof on the technical room to allow the electrician to connect up the fuse box with the mains. However, I have actually got back out before that has been done and have completed the final roof, as seen in the following…
Test installation of the firepit in top void of the wall is successful. It was a little windy and too light to get the full effect in the photo, but is going to be great at night! Next up was to finished the pointing of the stone tiles on the…
A couple of weeks over Easter back out in France and a chance to check on the progress of the pool house. The following photos show the progress made during our time in France, with the stone quoins and lintel being installed and then a white monocouche (render) being put…
One of the main jobs to do whilst out in France for a couple of weeks was to install the finished materials on the feature wall and render the other exposed concreate walls. A bit of a labour of love and definitely a family effort, it took around two days…
Well nearly… The pipes from the pool and into the technical room have now been connected and the remainder of the plumbing within the technical room completed. This work included the installation of the other two pumps and the filter cartridge unit. We opted for a cartridge system, as we…
We’ve managed to grab a couple of weeks out in France over the Easter holiday, so can see the progress made on the pool house and the rendering of the pool walls. There is about another days’ work on the pool floor and walls before it is ready for the…