Plumbing finished…

Well nearly… The pipes from the pool and into the technical room have now been connected and the remainder of the plumbing within the technical room completed. This work included the installation of the other two pumps and the filter cartridge unit. We opted for a cartridge system, as we will be away a lot still initially and is therefore lower maintenance (no regular backwashing required).

Although not in the photo, there is now a temporary roof on the technical room, so that the electrics can be installed.

The final pieces of pumping work are the pompe a chaleur and the back of the waterfall feature, now that the rendering has been done on that wall.