Slabs poured…

The three slabs were all poured today and look great. A slight shower shortly after pouring, but never rained to hard and will not impact finish.

Beach and shallow end slabs can be see in the photo below, with the bubblers and drains visible (drains under blocks!)

The following photo shows the poured slab for the roller shutter pit, with the rebar set for the walls.

Comments are closed.