Slabs ready for pour…

The three slabs are now ready for the concrete pour tomorrow. Following photo shows the bubblers in what will be the beach (plage) area.

The next photo shows the beach and shallow end, with the shallow end drains being set level in ready-mix concrete, ahead of the pouring of the slab.

The third slab is for the fosse (pit) where the roller shutter will be situated. This will be covered / hidden by a feature diving wall (technically a suspended beam).

Comments are closed.