Vertical reinforcement

All of the 8mm vertical re-bar has now been added to the pool walls, ready for the concrete pour.

The two ends also have L-Shaped re-bar inserted at 25cm intervals to connect the slabs that will be added at either end for the ‘beach area’ and hidden roller shutter (deep end).

This way, all of the structural concrete will be reinforced to protect against the forces that be excerpted upon them. The deep end wall also shows the four longer re-bars that have been put in at either corner to connect with what will be the suspended beam wall to hide the roller shutter.