All ready for pour

Everything is now prepared and ready for the pouring of the concrete into the blocks. I have put some scaffolding planks (old formwork boards) on spare blocks to help with the pour as the height from the inside of the pool is now standing at 1.6m.

You can also see that I have taped over the projectors and inlet pipes to protect them against any overspill when pouring the concrete.

Comments are closed.