Terrace work update…

Raised terraces are now complete, with the exception of the tiles which will be done at a later date, along with the pool deck level patio.

The steps rise up to a higher level terrace, with dinning area in the middle, which will be enclosed with a glass balustrade. Currently the bottom step looks like a massive one, but the pool deck level is still to come up another 500-600mm, so will then be nice even steps.

Still no sign of when I will be able to get back out to France to continue with the pool itself, with France now entering into a third national lockdown for at least four weeks.

Some more close up shots below.